Welcome
Quinault Beach Resort & Casino Ocean Shores
I-5's multi-discipline approach to this project allowed for a quick turn-around time for Quil Ceda Casino. Utilizing a digital workflow, the project was seamlessly brought from the design phase into the build phase. All of the custom design elements were pre-assembled in-house at I-5's state-of-the-art manufacturing facility. If this aerial view of the Great Barrier Reef is a reminder that you everything Australia, today's your day. Australia Day commemorates January 26, 1788, when the first transplants from England said g'day to Australian shores, but you can just call it a day to celebrate all things Aussie.
StayGet a room on the beach
PlayVegas style casino
DineAward winning cuisine
SpaResort spa & giftshop
Diamond Jo Casino
EntertainmentFree entertainment in the Ocean Lounge
Q Casino Renovation &
Room was perfect, ocean view on the 4th floor. Ate in the Ocean Lounge for dinner. Both places had great service and food. Enjoyed the slot machines.
Linda H - Trip AdvisorStay
Join the Q-Club Rewards® program and start earning points today
Queen
King
Studio
Indoor Pool
Take a rejuvenating swim.- Overlooking dunes
- Pool hours: 7AM-9PM
- Adult only hours: 9PM-12AM
- Hot tub
Gift Shop
The perfect place for a special gift or memento.- Beautiful selection of jewelry
- Destination apparel
- Souvenirs
- Candy, snacks, beverages
- And more.
Rewards
Eligible for- Drawings and promotions
- Mailers
- Special offers
- 10% off for hotel stays
Concierge
24 Hours a DayQ Casino Yuma
- Room service
- Local information
- Free shuttle
- Local shops
(888) 461 2214
Your Vacation Awaits
Check out our great room packages available.
PlayVegas style casino
DineAward winning cuisine
SpaResort spa & giftshop
Diamond Jo Casino
EntertainmentFree entertainment in the Ocean Lounge
Q Casino Renovation &
Room was perfect, ocean view on the 4th floor. Ate in the Ocean Lounge for dinner. Both places had great service and food. Enjoyed the slot machines.
Linda H - Trip AdvisorStay
Join the Q-Club Rewards® program and start earning points today
Queen
King
Studio
Indoor Pool
Take a rejuvenating swim.- Overlooking dunes
- Pool hours: 7AM-9PM
- Adult only hours: 9PM-12AM
- Hot tub
Gift Shop
The perfect place for a special gift or memento.- Beautiful selection of jewelry
- Destination apparel
- Souvenirs
- Candy, snacks, beverages
- And more.
Rewards
Eligible for- Drawings and promotions
- Mailers
- Special offers
- 10% off for hotel stays
Concierge
24 Hours a DayQ Casino Yuma
- Room service
- Local information
- Free shuttle
- Local shops
(888) 461 2214
Your Vacation Awaits
Check out our great room packages available.
Q Casino Renovation Plan
Ellicott Creek Park
2012 - 2020 Capital Improvements:
Project Name | Problem/Issue | Type of Work Completed | Cost to Complete |
Fisherman's Comfort Station | Closed down previous two years due to extensive repairs required. | Main waterline repaired, electrical upgrades/repairs, drainage work, new siding and general carpentry. | $49,988.00 |
Island Parking Lot | Huge lot was in terrible condition with large holes, voids and no direction. | Reduced the size of the lot and resurfaced remaining lot to make much safer and much more maintenance friendly. | $45,000.00 (Estimate– work done as part of a HWYs bid) |
Shelter 10 A/B Roof | Age and overall poor condition. | Entire roof replaced | $6,872.00 |
Friendship Building | Restrooms in poor condition due to uneven floors, poor lighting, cracked sinks and general overall condition. Entire interior in need of renovation. Additional parking needed. | Complete remodel of men's and women's restrooms, including ADA accepted stalls. New appliances, drop ceiling, flooring and countertops installed. Parking lot extended and paved. | $65,529.00 |
Water Main | Water main broke underneath bike path. No water to a main restroom. Immediate repair required. | New water main installed | $11,190.00 |
Pedestrian Bridge | Railings along bridge in disrepair | Railings replaced | $2,723.00 |
Tennis Courts | Courts in poor shape. Surface has cracks and voids. Hardware is unusable. | Courts resurfaced and restriped. New hardware, nets and posts installed. Courts are now dual use for Pickleball. | $61,900.00 |
Casino Fireplace | Fireplace not usable. Doors need to be replaced. | New doors installed. Fireplace insert installed. | $4,562.00 |
Residence | Chimney leaking into the house. Also needed to be repointed. | Chimney repaired and repointed. | $4,500.00 |
Friendship Building Boiler | Boiler not working. | New boiler installed. | $2,986.00 |
Casino Chimney | Chimney leaking into the Casino. Also needed to be repointed. | Chimney repaired and repointed. | $7,950.00 |
Kayak Launch | Seasonal kayak launch installed. | $17,146.00 | |
Fuel System Upgrade | In the future, fuel pumps will need to be relocated. | Electrical upgrade to fuel system installed at new location. | $9,787.00 |
Parking Lot and Roadway Improvements | Parking lot at new kayak launch needed to be paved. | Parking lot oil/chipped. | $27,660.00 |
Shelters 2, 3, 4, 17 Improvements | Roofs at 2, 3, 4 were in overall poor condition. Concrete pads at 3, 17 were in in overall poor condition. | Roofs completely replaced at shelters 2, 3, & 4. Concrete pads completely replaced at shelters 3 & 17. | $24,709.00 |
Dog Island Dome Roof Renovation | Roof in overall poor condition. | Complete tear off and rebuild of roof. | $3,692.00 |
Consulting Fees for Shelter Reconstruction | Shelters 6, 7, 9 are in poor condition. | Consultant developed reconstruction plan for shelters' WPA era stonework. | $20,297.00 |
New Shelter Build | In need of an additional shelter. | Constructed Shelter 13. | $74,396.00 |
Shelter 14 Reconstruction | Shelter in disrepair. | Shelter torn down and completely rebuilt. | $55,071.00 |
Paving | Parking area at Shelter 13 and some roadway in need of paving. | Paved necessary areas. | $22,031.00 |
Casino Roof | Boiler room roof in disrepair. | Flat roof redone. | $8,913.00 |
Pedestrian Bridge | Design/ Inspection Services | $47,987.00 | |
Shelter 9 | Poor Condition | Demo/Rebuild Shelter and Pergola | $92,773.00 |
Kayak Launch | New | Added a Kayak Launch | $9,877.00 |
Shelter 9 & 10 | Shelters 9, 10 in poor condition | Shelters 9 & 10 Paving | $35,000.0035000 |
Q Casino Renovation News
Total: $712,539.00